Product Pages

DFW Connector Whitepaper

Issue link: https://mastery.commandalkon.com/i/1055546

Contents of this Issue

Navigation

Page 0 of 0

$1.2B DFW Connector Project Top-tier construction giants Kiewit and Zachry teamed up on the $1.2B+ DFW Connector Project and reaped substantial results through digital collaboration via CONNEX Jobsite. 655,000 Cubic Yards of Concrete 3 Million Cubic Yards of Excavation 2.3 Million Tons of Aggregate 226 , 000 Tons of Asphalt 46,000 Truck Tickets/Timecards 15,000 Hours of OSR trucks All tracked in CONNEX Jobsite How? Result: $3.6 Million Project Cost Savings See results like this on your next project! CONNEXjobsite.com Reduced material yield costs Payment cycle reduced to just 10 days - with 100% accuracy Integrated all ends of the supply chain from materials suppliers through to DOT 10% reduction in hourly trucking costs through truck tracking Shared information electronically - minimizing data entry Complied with DBE trucking reports and requests in days vs. months Tickets Details Statuses Batch Results Test Results Images Delivery Status Time Time 11:23:30 AM 01/12/2020 Load Time 11:28:53 AM 01/12/2020 Loaded Time 11:35:14 AM 01/12/2020 Job Time 11:40:30 AM 01/12/2020 Reject Ticket Accept Ticket

Articles in this issue

Links on this page

view archives of Product Pages - DFW Connector Whitepaper